When a community is faced with a chronic flooding problem, Ciorba Group takes pride in assisting the community with responding to residents’ concerns and improving their quality of life.  Ciorba’s water resources engineers will begin by performing studies to identify the cause of the problem.  Once the cause is defined, we will develop alternative plans, prepare cost estimates, and recommend the most economical and effective method of alleviating the flooding.  Our engineers can then take the next step by preparing designs and bid documents based on the alternative plan selected by the community.  Finally, when it comes time for construction of the designed improvements, Ciorba’s resident engineers will work closely with the community and the local residents to implement the solution with as little disruption to the community as possible.