Golfview Lift Station

Client

Illinois Tollway

Location

Winnebago County, Illinois

Ciorba provided the design of a duplex submersible lift station to serve a 240 acre residential and commercial area. The design capacity of the lift station is 2,800 gpm maximum in order to handle peak wet weather flows. The project consisted of converting an existing wet well / dry well station into a submersible station with ground level bypass. Improvements included the construction of a new wet well, and full mechanical, electrical, and controls installation on the site. Services include the preparation of plans and specifications; construction cost estimation; bid documents; permitting; collecting construction bids and making recommendations to the client.